A commercial solar system is a 20–30 year asset. Most of its value is decided after commissioning — by how well it is monitored, maintained and re-checked as equipment ages and the site changes.

Modules age slowly, inverters wear out, warranties expire, monitoring lapses and the people who approved the project move on. For hospitals and other high-consumption facilities, that drift can quietly erode savings the board is still counting on. These guides are written for facility managers, CFOs and hospital boards who want to keep a solar asset performing for its full life.
A typical 25-year operating life for a commercial solar system, and when each kind of attention tends to matter.
Year 0–1
Years 1–5
Monitoring review Savings vs promise check Hospital solar checks
Years 5–10
Years 10–15
Years 15–25+
Timings are typical and vary by equipment, site conditions and contract. SolarMD is independent: we review, plan and organise evidence. Repairs, replacements and warranty work are carried out by qualified partners or the warranty holder.
SolarMD funds and operates solar for commercial and industrial sites under its Zero Capex PPA, and looks after every system it funds for the full 10- to 25-year term. We are not an installer, an equipment seller or a bank. We also offer independent checks of systems we did not fund; when we make our own PPA offer, we say so.
Why the middle years quietly decide whether a system keeps paying back — and what to review before warranties and inverters run out.
Read the guide →Inverters are the component most owners will replace at least once. How to spot end-of-life signs, set a reserve and avoid emergency decisions.
Read the guide →Manufacturers and contractors ask for proof. The records, data and field tests that make a warranty or performance claim credible.
Read the guide →Some output loss is normal. Most large losses are not. How to read the data and separate slow ageing from problems you can fix.
Read the guide →SolarMD funds, owns and looks after solar for commercial and industrial businesses with a monthly electricity bill of ₱1.2 million and up, including hospitals, with ₱0 upfront under a 10- to 25-year Zero Capex PPA. As the funder and long-term operator, we run the same performance checks and asset care on every system we fund. We also review systems we did not fund; when we make our own PPA offer, we say so. Qualified EPC partners carry out installation, repairs and engineering sign-off.
Or email relations@solarmd.net · See a sample Solar Health Score report (PDF)
Commercial and industrial businesses in Mindanao with a monthly electricity bill of ₱1.2 million and up, in any sector including hospitals, can apply for a 10- to 25-year SolarMD solar PPA. Switch Assistance (RES) is a separate, optional service and is not required for rooftop solar.
Zero-capex rooftop solar for Mindanao's commercial and industrial sites. ₱0 upfront, for businesses with monthly power bills of ₱1.2M or more.
Dr. Andrie Udal, PhD in Mineral and Energy Economics
Power Investor | Managing Partner
6th Floor, Felcris Centrale Mall,
Quimpo Blvd, Davao City
relations@solarmd.net
+63 917 152 9010 (Viber / WhatsApp)
Funded Rooftop (PPA)
How it works
Check your site’s eligibility
About SolarMD
Client projects
Refer a project
FAQ
Savings typically vary by site and tariff. Every offer is subject to a site assessment, credit review and signed contract. © 2026 SolarMD. Vendor Integrity Portal